Analysing the impact of alternative network structures on resource-constrained schedules: Artificial and empirical experiments
Servranckx, Tom ; Vanhoucke, Mario ; Vanhouwaert, Giel
Servranckx, Tom
Vanhoucke, Mario
Vanhouwaert, Giel
Citations
Altmetric:
Publication Type
Journal article with impact factor
Editor
Supervisor
Publication Year
2020-10
Journal
Computers & Industrial Engineering
Book
Publication Volume
148
Publication Issue
October
Publication Begin page
1
Publication End page
15
Publication Number of pages
Collections
Abstract
In this research, we investigate an extension of the resource-constrained project scheduling problem (RCPSP) with alternatives in the project structure, the so-called RCPSP with alternative subgraphs (RCPSP-AS). The RCPSP-AS consists of a selection subproblem to decide amongst the alternatives in the project structure and a scheduling subproblem to schedule the selected activities in the resulting project structure. In case of a high number of alternatives, however, the selection subproblem might become very complex. In this research, we therefore present a two-step procedure to reduce the complexity of the selection subproblem of the RCPSP-AS. First, we construct a set of high-quality schedules and, subsequently, we analyse the selected alternatives in this set of schedules. Based on two thresholds, defined as the schedule diversity and choice frequency thresholds, we aim at reducing the number of alternatives in the problem. In doing so, the selection subproblem becomes easier to solve thanks to the lower number of alternatives to choose from, and consequently, the solution procedure to solve the RCPSP-AS should now focus on the scheduling subproblem. However, the computational experiments show that both thresholds should be set with care since the low complexity of the selection subproblem might result in some side effects. More precisely, we investigate the impact of both thresholds on the quality of the final schedule as they impact the stop criterion and the size of the neighbourhood in a solution procedure. We have developed our approach based on empirical case studies and validated the results on a large set of artificial projects.