Improving project forecast accuracy by integrating earned value management with exponential smoothing and reference class forecasting
Batselier, Jordy ; Vanhoucke, Mario
Batselier, Jordy
Vanhoucke, Mario
Citations
Altmetric:
Publication Type
Journal article with impact factor
Editor
Supervisor
Publication Year
2017
Journal
International Journal of Project Management
Book
Publication Volume
35
Publication Issue
1
Publication Begin page
28
Publication End page
43
Publication NUmber of pages
Collections
Abstract
In this paper, the earned value management (EVM) project control methodology is integrated with the exponential smoothing forecasting approach. This results in an extension of the known EVM and earned schedule (ES) cost and time forecasting formulas. A clear correspondence between the established approaches and the newly introduced method - called the XSM - is identified, which could facilitate future implementation. More specifically, only one smoothing parameter is needed to calculate the enhanced EVM performance factor. Moreover, this parameter can be dynamically adjusted during project progress based on information of past performance and/or anticipated management actions. Additionally, the reference class forecasting (RCF) technique can be incorporated into the XSM. Results from 23 real-life projects show that, for both time and cost forecasting, the XSM exhibits a considerable overall performance improvement with respect to the most accurate project forecasting methods identified by previous research, especially when incorporating the RCF concept.