• Login
    Search 
    •   Vlerick Repository Home
    • Vlerick Research Output
    • Search
    •   Vlerick Repository Home
    • Vlerick Research Output
    • Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Browse

    All of Vlerick RepositoryCommunities & CollectionsPublication DateAuthorsTitlesSubjectsKnowledge Domain/IndustryThis CommunityPublication DateAuthorsTitlesSubjectsKnowledge Domain/Industry

    My Account

    LoginRegister

    Filter by Category

    Author
    Martens, Annelies (1)
    Vanhoucke, Mario (1)
    Subject
    Earned Value Management (1)
    Empirical Data (1)
    Project Management (1)
    Schedule Control (1)View MoreDate Issued2018 (1)Knowledge Domain/Industry
    Operations & Supply Chain Management (1)
    Publication TypeJournal article with impact factor (1)

    Contact & Info

    ContactVlerick Journal ListOpen AccessVlerick Business School

    Statistics

    Display statistics
     

    Search

    Show Advanced FiltersHide Advanced Filters

    Filters

    Now showing items 1-1 of 1

    • List view
    • Grid view
    • Sort Options:
    • Relevance
    • Title Asc
    • Title Desc
    • Issue Date Asc
    • Issue Date Desc
    • Results Per Page:
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100

    • 1CSV
    • 1RefMan
    • 1EndNote
    • 1BibTex
    • Selective Export
    • Select All
    • Help
    Thumbnail

    An empirical validation of the performance of project control tolerance limits

    Martens, Annelies; Vanhoucke, Mario (Elsevier, 2018)
    The goal of project control is monitoring the project progress during project execution to detect potential problems and taking corrective actions when necessary. Tolerance limits are a tool to assess whether the project progress is acceptable or not, and generate warnings signals that act as triggers for corrective action to the project manager. In this paper, three distinct types of tolerance limits that have been proposed in literature are validated on a large and diverse set of real-life projects mainly situated in the construction sector. Moreover, a novel approach to construct tolerance limits that integrate the project risk information into the monitoring process is introduced. The results of the empirical experiment have shown that integrating project-specific information into the construction of the tolerance limits results in a higher efficiency of the monitoring process. More specifically, while including cost information increases the efficiency only marginally, incorporating the available resource information substantially improves the efficiency of the monitoring process. Furthermore, when projects are not restricted by scarce resources, the efficiency can be enhanced by integrating the available project risk information.
    DSpace software (copyright © 2002 - 2019)  DuraSpace
    Quick Guide | Contact Us
    Open Repository is a service operated by 
    Atmire NV
     

    Export search results

    The export option will allow you to export the current search results of the entered query to a file. Different formats are available for download. To export the items, click on the button corresponding with the preferred download format.

    By default, clicking on the export buttons will result in a download of the allowed maximum amount of items.

    To select a subset of the search results, click "Selective Export" button and make a selection of the items you want to export. The amount of items that can be exported at once is similarly restricted as the full export.

    After making a selection, click one of the export format buttons. The amount of items that will be exported is indicated in the bubble next to export format.