• Login
    View Item 
    •   Vlerick Repository Home
    • Research Output
    • Articles
    • View Item
    •   Vlerick Repository Home
    • Research Output
    • Articles
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Browse

    All of Vlerick RepositoryCommunities & CollectionsPublication DateAuthorsTitlesSubjectsKnowledge Domain/IndustryThis CollectionPublication DateAuthorsTitlesSubjectsKnowledge Domain/Industry

    My Account

    LoginRegister

    Contact & Info

    ContactVlerick Journal ListOpen AccessVlerick Business School

    Statistics

    Display statistics

    Constructive heuristics for selecting and scheduling alternative subgraphs in resource-constrained projects

    • CSV
    • RefMan
    • EndNote
    • BibTex
    • RefWorks
    Thumbnail
    Name:
    Publisher version
    View Source
    Access full-text PDFOpen Access
    View Source
    Check access options
    Check access options
    Publication type
    Journal article with impact factor
    Author
    Nekoueian, Rojin
    Servranckx, Tom
    Vanhoucke, Mario
    Publication Year
    2023
    Journal
    Computers & Industrial Engineering
    Publication Volume
    182
    Publication Issue
    August
    
    Metadata
    Show full item record
    Abstract
    In this paper, we investigate two constructive heuristics based on existing and newly developed priority rules (PRs) for the resource-constrained project scheduling problem with alternative subgraphs (RCPSP-AS). The RCPSP-AS deals with scheduling the selected activities from work packages that can be executed in different ways, resulting in a selection and a scheduling subproblem. The inclusion of alternatives in the project structure implies that even moderate-sized projects become very large, motivating the use of PR-based approaches. In the existing literature, many PRs were already developed for the scheduling subproblem, however, no studies have focused on specific PRs for the selection subproblem. Therefore, we examine the performance of previously developed PRs for the RCPSP-AS and observe that employing a unique PR for each subproblem decreases the project makespan. Based on this knowledge, we develop two constructive heuristics based on well-suited PRs. In the first constructive heuristic, distinct PRs are selected based on the project properties, while several schedules according to different PRs are generated in the second constructive heuristic. Our experiments show that project managers should consider the project properties and select the appropriate selection PRs accordingly in order to minimise the project makespan in the RCPSP-AS.
    Keyword
    Project Scheduling, Resource-Constrained Scheduling, Alternative Subgraphs, Priority Rules, Constructive Heuristics
    Knowledge Domain/Industry
    Operations & Supply Chain Management
    DOI
    10.1016/j.cie.2023.109399
    URI
    http://hdl.handle.net/20.500.12127/7247
    ae974a485f413a2113503eed53cd6c53
    10.1016/j.cie.2023.109399
    Scopus Count
    Collections
    Articles

    entitlement

     
    DSpace software (copyright © 2002 - 2023)  DuraSpace
    Quick Guide | Contact Us
    Open Repository is a service operated by 
    Atmire NV
     

    Export search results

    The export option will allow you to export the current search results of the entered query to a file. Different formats are available for download. To export the items, click on the button corresponding with the preferred download format.

    By default, clicking on the export buttons will result in a download of the allowed maximum amount of items.

    To select a subset of the search results, click "Selective Export" button and make a selection of the items you want to export. The amount of items that can be exported at once is similarly restricted as the full export.

    After making a selection, click one of the export format buttons. The amount of items that will be exported is indicated in the bubble next to export format.