On the summary measures for the resource-constrained project scheduling problem
Publication type
Journal article with impact factorPublication Year
2024Journal
Annals of Operations ResearchPublication Volume
337Publication Begin page
593Publication End page
625
Metadata
Show full item recordAbstract
The resource-constrained project scheduling problem is a widely studied problem in the literature. The goal is to construct a schedule for a set of activities, such that precedence and resource constraints are respected and that an objective function is optimized. In project scheduling literature, summary measures are often used as a tool to evaluate the performance of algorithms and to analyze instances and datasets. They can be classified in two groups, network measures describe the precedence constraints of a project, while resource measures focus on the resource constraints of the instance. In this manuscript we make an exhaustive evaluation of the summary measures for project scheduling. We provide an overview of the most prevalent measures and also introduce some new ones. For our tests we combine different datasets from the literature and generate a new set with diverse characteristics. We evaluate the performance of the summary measures on three dimensions: consistency, instance complexity and algorithm selection. We conclude by providing an overview of which measures are best suited for each of the three investigated dimensions.Knowledge Domain/Industry
Operations & Supply Chain Managementae974a485f413a2113503eed53cd6c53
10.1007/s10479-023-05470-8